WATER WELL NO. 4: 500 GPM WELL & 6" WATER LINE - Construction of a 500 gpm water well, chlorination system and building, 2,200 feet of 6 inch water line
City of Thornton, AR
THORNTON TREATMENT PLANT MODIFICATIONS - Design of iron removal treatment plant.
Chambersville Water Association
CHAMBERSVILLE WATER SYSTEM - Design of 50,000 gallon standpipe, new well, and 200,000 feet of 6, 4, 3 and 2 inch water line.
City of Smackover, AR
100,000 GALLON TANK & 400 GPM WELL - Design of a 100,000 gallon elevated water tank, a 400 gpm water well, chlorination system and building, and 6" distribution line
Village Water Association
VILLAGE WATER ASSOCIATION - Design of complete water system including 110 gpm well, 50,000 gallon elevated storage tank and 88,000 feet of 8,6,4,3, and 2 inch distribution line.
Client
Description
City of El Dorado, AR
EL DORADO SEWER & STREET IMPROVEMENTS -10,250 feet of gravity sewer line, sewage lift station, & reconstruction of 7,500 feet of curb & gutter street.
City of Strong, AR
STRONG STREET, DRAINAGE & WATER IMPROVEMENTS - 3,800 feet of reconstructed street, 3,500 feet of concrete ditches and drainage pipe and 5,000 feet of water line.
City of Smackover, AR
SMACKOVER SEWER & STREET IMPROVEMENTS - 7,895 feet of gravity sewer lines & pump station, and 3,000 feet of reconstructed street.
Atlantic Research
ROADS & BUILDINGS - Designed layouts of roads and buildings to conform with blast requirements.
Velsicol Chemical Corporation
TRUCK SCALES - Installation of truck scales and associated roads.
Client
Description
City of El Dorado, AR
GOODWIN FIELD AIRPORT - Design of taxiway rehabilitation
City of Smackover, AR
SMACKOVER AIRPORT - Master Plan development
City of El Dorado, AR
GOODWIN FIELD AIRPORT - Resurfacing of runway 4-22
City of El Dorado, AR
GOODWIN FIELD AIRPORT - Taxiway lighting & drainage improvements
Client
Description
City of Huttig, AR
DRAINAGE DITCH & CULVERTS – Design of 3,000’ of drainage ditch and associated 18”, 24” & 30” culverts
City of Smackover, AR
SMACKOVER RING LEVEE – Design of 1,000’ of levee, & installation of two 60” culverts & flap gates
City of Smackover, AR
SMACKOVER DRAINAGE - Construction of 2,600’ of ring levee & 7,250’ of concrete lined ditch
Atlantic Research
ROADS & BUILDINGS - Designed layouts of roads and buildings to conform with blast requirements.
City of El Dorado, AR
GOODWIN FIELD AIRPORT - Sliplining 2,160’ of 18” to 48” culverts & replacement of 5,500’ of culverts
City of El Dorado, AR
EL DORADO DRAINAGE IMPROVEMENTS – Design of 1,920’ of box culvert &1,000’ of drainage pipe
Client
Description
Southwest Solid Waste District
SOUTHWEST ARKANSAS SOLID WASTE DISTRICT MASTER PLAN - Developed solid waste master plan
for a seven county area in Southwest Arkansas.
City of El Dorado, AR
EL DORADO LANDFILL CLOSURE – Designed a closure plan for El Dorado landfill.
Ashley County, AR
ASHLEY COUNTY LANDFILL – Designed a landfill and monitoring wells for Ashley County.
Velsicol Chemical Corporation
CONTAMINATED WASTE DISPOSAL - Designed a contaminated waste disposal area
Great Lakes Chemical Corp.
SANITARY LANDFILL - Designed sanitary landfills
for El Dorado and Marysville plant site.
Great Lakes Chemical Corp.
SANITARY LANDFILL - Designed sanitary landfills
for El Dorado and Marysville plant site.